Introduction

What you need

Step 1

              How to Fix a Broken Portion of a Driveway               
  • Using the crowbar, shovel, and hammer as needed, wedge out the broken pieces of concrete intended to be replaced.
  • Remove these pieces from the site.

Using the crowbar, shovel, and hammer as needed, wedge out the broken pieces of concrete intended to be replaced.

Remove these pieces from the site.

1024

Step 2

  • Using the shovel, create an area along the perimeter of the empty section of the driveway to fit the wooden 2x4.
  • Place the 2x4 in this section.
  • Use the hammer to drive the stakes into the ground on the outside of the section and snuggly against the wood to hold in place.

Using the shovel, create an area along the perimeter of the empty section of the driveway to fit the wooden 2x4.

Place the 2x4 in this section.

Use the hammer to drive the stakes into the ground on the outside of the section and snuggly against the wood to hold in place.

Step 3

  • Using the leveler, ensure that the top of the wood is approximately level with the remaining concrete from the driveway (optional).

Using the leveler, ensure that the top of the wood is approximately level with the remaining concrete from the driveway (optional).

Step 4

  • Use the shovel to level the ground area where the concrete will be poured.

Use the shovel to level the ground area where the concrete will be poured.

Step 5

  • Pour the concrete mix into a wheelbarrow.
  • Using the water hose, wet the unmixed concrete as specified by the concrete mix instructions.
  • Use the hoe to mix the concrete until it is all wet.

Pour the concrete mix into a wheelbarrow.

Using the water hose, wet the unmixed concrete as specified by the concrete mix instructions.

Use the hoe to mix the concrete until it is all wet.

Step 6

  • Pour the mixed concrete into the empty section of the driveway.
  • Use the trowel to smooth and level the new concrete even with the original concrete.
  • Repeat steps 5 and 6 until the hole is fully filled and level.

Pour the mixed concrete into the empty section of the driveway.

Use the trowel to smooth and level the new concrete even with the original concrete.

Repeat steps 5 and 6 until the hole is fully filled and level.

Step 7

  • Wait 24 hours (or a period specified by the concrete mix manufacturer) for the concrete to completely dry. Then remove the form.
  • Then remove the form.

Wait 24 hours (or a period specified by the concrete mix manufacturer) for the concrete to completely dry. Then remove the form.

Then remove the form.

To reassemble your device, follow these instructions in reverse order.

Cancel: I did not complete this guide.

Author

                                      with 1 other contributor 

                    Ryne Dennis                     

Member since: 03/25/2020

145 Reputation

                                      1 Guide authored                  



                       Badges:
                       2

Team

                       University of Memphis, Team S5-G5, Willis Spring 2020                        

                                                  Member of University of Memphis, Team S5-G5, Willis Spring 2020 



                    UM-WILLIS-S20S5G5                     


                                            2 Members                     


                                            1 Guide authored